  Case Studies


Turnkey Projects

 

Socorro ISD - Phase 1, Texas


This project was carried out for Socorro ISD in 2001. The EnLink installation includes 50 heat pumps for a total of 155 tons, and 91 vertical boreholes of 300 feet deep.
This project brought the 1921 building into the twenty first century for health & comfort.

 

Adelphi University, New York


This project is currently under construction, handled by EnLink's Northeast Regional office. The EnLink technical team is drilling a total of 60 vertical boreholes at 460 feet deep for the university's new geothermal heat pump system.


 

El Paso Chamber of Commerce, Texas


This 264-ton installation for the Chamber of Commerce was finished in March 2002. This installation required 128 vertical boreholes at 350 feet deep. The system was designed based on a 70O F earth temperature.
Case Study
*


 

Santa Teresa Middle School - Gadsden ISD, Texas


Gadsden ISD and EnLink significantly improved the learning environment of the children and teachers of this campus. It is a 400-ton installation that required more than 200 vertical boreholes of 400 feet deep. The system was designed based on a 70O F earth temperature.
Case Study *


* You will need Adobe Acrobat Reader in order to view the case studies. If you need to download Acrobat Reader, click here
 

 


EnLink Geoenergy Services, Inc.
16430 Park Ten Place, # 600 - Houston, TX 77084
Tel : (281) 398.6880- Fax : (281) 398.6715

 web hosting and ongoing web development by DonDulin.com